project image

Specification Summary of Entasis

Structure
Seismic Zone III complaint structure. Partition walls in solid cement block finished with cement plaster 1:5 and ceiling finished with cement plaster 1:3

Electrification
Concealed wiring with first quality branded cables and modular switches with ISI standard. There will be provision for geyser in master bed toilet and A.C. point in master bed room.

Plumbing
Concealed plumbing work with ISI standard in Toilet, Kitchen & Work area

Sanitary Fittings
First quality E.W.C floor mounted suite in all toilets. 20" wash basin with half pedestal in all toilets. Double bowl sink with drain board in Kitchen and single bowl without drain board in Work area. All taps will be C.P finish branded.

Doors & Windows
All doors in Irul frame and double skin molded partition shutter with enamel paint finish. Windows with powder coated aluminum sections and 4mm glazed sliding shutters with m.s. grill.

External finish
First quality exterior emulsion over exterior cement primer

Interior finish
First quality interior emulsion over Interior primer and cement based putty

Floor finish
Floor finish with 60x60cm branded vitrified tiles in all rooms except toilets. Toilet wall & floor will be ceramic 30x45cm and 30x30cm respectively. Up to false ceiling tiling will be there. Work area and Balcony will be 30x30cm rustic tiles. Staircase and open terrace with 20mm thick cement tiles.

Fire fighting
As per Govt. standard norms

Water source
Own source bore well or open well

Specification Summary of Pilaster

Structure
Seismic Zone III complaint structure. Partition walls in solid cement block finished with cement plaster 1:5 and ceiling finished with cement plaster 1:3.

Electrification
Concealed wiring with first quality branded cables and modular switches with ISI standard. There will be provision for geyser in master bed toilet and A.C. point in master bed room

Plumbing
Concealed plumbing work with ISI standard in Toilet, Kitchen & Work area.

Sanitary Fittings
First quality E.W.C floor mounted suite in all toilets. 20" wash basin with half pedestal in all toilets. Double bowl sink with drain board in Kitchen and single bowl without drain board in Work area. All taps will be C.P finish branded

Doors & Windows
Front door in teak wood and all other doors in Irul frame and double skin molded partition shutter with enamel paint finish. Windows with powder coated aluminum sections and 4mm glazed sliding shutters with m.s. grill

External finish
First quality exterior emulsion two coat over one coat of exterior cement primer.

Interior finish
First quality interior emulsion over one coat of interior primer and two coat of cement based putty.

Floor finish
Floor finish with 60x60cm branded vitrified tiles in all rooms except toilets. Toilet wall & floor will be ceramic 30x45cm and 30x30cm respectively. Up to false ceiling tiling will be there. Work area and Balcony will be 30x30cm rustic tiles. Staircase and open terrace with 20mm thick cement tiles

Fire fighting
As per Govt. standard norms

Water source
Own source(bore well) and KWA connection

Specification Summary of Pilaster

Structure
Seismic Zone III complaint structure. Partition walls in solid cement block finished with cement plaster 1:5 and ceiling finished with cement plaster 1:3.

Electrification
Concealed wiring with first quality branded cables and modular switches with ISI standard. There will be provision for geyser in master bed toilet and A.C. point in master bed room

Plumbing
Concealed plumbing work with ISI standard in Toilet, Kitchen & Work area

Sanitary Fittings
First quality E.W.C floor mounted suite in all toilets. 20" wash basin with half pedestal in all toilets. Double bowl sink with drain board in Kitchen and single bowl without drain board in Work area. All taps will be C.P finish branded.

Doors & Windows
Front door in teak wood and all other doors in Irul frame and double skin molded partition shutter with enamel paint finish. Windows with powder coated aluminum sections and 4mm glazed sliding shutters with m.s. grill

External finish
First quality exterior emulsion two coat over one coat of exterior cement primer.

Interior finish:
First quality interior emulsion over one coat of interior primer and two coat of cement based putty.

Floor finish
Floor finish with 60x60cm branded vitrified tiles in all rooms except toilets. Toilet wall & floor will be ceramic 30x45cm and 30x30cm respectively. Up to false ceiling tiling will be there. Work area and Balcony will be 30x30cm rustic tiles. Staircase and open terrace with 20mm thick cement tiles.

Fire fighting
As per Govt. standard norms

Water source
Own source(bore well) and KWA connection